visual and mechanical inspections before energization equipment and cables test on DC and AC inverters setup according to the grid standard monitoring system setup weather sensors integration
EN62446 tests
commissioning tests plant certification production reports strings IV curves measurement mechanical displacements measurement pr measurements monitoring system check final acceptance tests
POT – Pull Out Tests
the purpose of the tests is to measure the loads needed to pull-out ramming profiles of ground-mounted PV support structure map with the testing points with GPS coordinates detailed testing procedure automated data acquisition for measurements