project site suitability assessment & Energy Yield Assessment
the assessment of the site suitability and site constraints review and will be carried out based on the documentation provided, the site visits, and on publicly available information
Energy Yield Assessment: yield and losses analysis (identification and assessment of all relevant causes of energy losses);
prediction of Net Production with associated probabilities of exceedance (P50, P75, P90 probabilities);
site location assessment
location and plots
site infrastructures
site access
surrounding area characterization
identification of possible and near far shading sources
other relevant information for construction and operation
review of the project documentation
identify any gaps and recommend any surveys or studies that are currently missing, including with respect to permits and licenses
Environmental Impact Assessment (EIA) review
red flag report
technical design assessment
technology, site capacity assessment and layout
estimate the potential installed capacity at the Project sites
restrictions and constraints, buffers, etc.
grid connection assessment
review of the proposed interconnection facilities
technical requirements, commercial terms
assessment of grid connection related permits
potential curtailment issues and grid reliability
summary of risks and opportunities
site visit reports:
the setting, nature, land use of the site and its immediate surroundings;
shading considerations affecting the energy yield;
site topography;
site access;
the site visit will also cover the expected grid connection point and the cable route to it.